Friday, 3 May 2013

Insulation Part 2

So the battens were attached with self tapping screws and I coated the back with silicone as it came into contact with the steel



The battens were squared from the floor, as I had used string lines to install it.
I then fitted the 1" polystyrene between the battens, fixing and sealing with silicone.

This resulted in a thickness of 3" below the gunwales and 2" above. Under the gunwales were insulated with strips of polystyrene, again fixed with silicone.


Some areas of the boat were difficult so
I used spray foam from cans to ensure a good seal.
The sides were made longer to create a natural trunking for cables. Where the cable runs were to feed sockets I used 9mm ply channels, so there was no contact between cable and polystyrene, as this could cause corrosion to the outer sheath of the cable.





Skirting channels were also created with ply to house the plumbing.

Insulation Part One

There  were three types of insulation that we considered
1 Sprayfoam. This was our favorite option and we were disappointed to have to rule it out. The few people that were prepared to haul their equipment down the towpath also needed electric, lighting and that the shell was dried out. The major problem was we were using my work generator and had no meams of going under a cover or anything. We investigated every avenue open to us but to no avail.
2 Fibreglass This was quickly ruled out mainly due to fire resistance and it's actual insulation properties.
3 Polystyrene So this is what we were left with, I sourced a company in Birminghamthat could supply 8*4 sheets of fire resistant polystyrene in various thicknesses as long as I bought pack quantities and collected.

With this now on the boat I set about the installation, using the structure of struts throughout the boat I cut panels of polystyrene, dried the area from condensation, and covering the backs with silicone, forced the polystyrene between each angle iron strut.


Using 2" thickness below the gunnels and 1" on the ffood and sides above she soon looked different.
Then I fixed treated 2*1 roof battens to the struts at 600mm centers to the struts
Then I repeated the process with1" polystyrene between my battens,again sealing with silicone.
The roof was completed in a similar manner using 3/4" materials.




































Tuesday, 30 April 2013

Fitting the floor

As Purrrfect she had bow thrusters fitted and the hydraulics ran the length of the boat, this dictated that I would have to raise the floor.
After cutting lengths of 3*2 to size I fixed them to the base struts using 3" stainless steel self tapping screw.
Then I fixed further lengths of 3*2 at 90 degrees to run the length of the boat and clear the hydraulic pipes.
These were also strategically placed to create access panels to the ballast and the hydraulics.
Using 18mm spruce ply, that I had treated on both sides prior to cutting, I created a series of access panels 300mm wide to run the complete length of the boat covering the hydraulics. This gave me a straight line that I used as a datum point for all setting out.
For the rest of the floor I cut panels at 27" centres to align with the ballast and then trimmed them to the width of the boat.
All of the edges were sanded and then treated with yacht varnish.
As the panels were fitted the substructure was adapted to become removable at the access panel positions
Soon the floor was completed and the difference was amazing. I could set up work benches, a mini kitchen from our camping gear and even a chair and small table.

Sunday, 28 April 2013

The Story Continues

So we had found the ideal size and style for our boat,we were also offered a mooring by Brinklow Boat Services, where we could work on her whilst she was still in the water.The hull had been blacked and the anodes renewed, she had also had a coat of primer to protect the new steel where the front bulkhead had been moved and of course the areas that had been repaired. The survey report was good and so the new shaped shell was born.
The first thing we had to do was clear some remnants of floor, burnt insulation and debris from the recent works.
We went about this task with vigour, working from the stern to the bow in a very efficient manner.
As we cleared each section I lifted the ballast, 2*2 paving slabs and waxoiled the base plate. Fox and I filled umpteenbags with debris and after a week of evenings we were ready to start work proper.

Frustration

The trouble with blogging from the mobile phone is that you cannot see what your writing as the keyboard hides the script. Please bear with me I have 3 years to catch up but I promise to be brief. Now I am going to learn how to upload photos.....Hopefully

Finding Purrrfect

On the 22ndof May 2010 my wife "Foz" and I Chris purchased a narrowboat shell called Purrrfect The boat had been in a horrendous fire but the hull, engine and most of the steel had survived.
Originally she was a semi-traditional style boat but with the required alterations to correct the damaged steel she became a cruiserstyle. The engine is a beta marine 42 with only 324 hours on the clock and in perfect working order.